Puerto Real project

Location

Puerto Real (Cádiz)

Technical data

Module area

Approx. 749,568 m2

Number of modules

468,480 units

Type of modules

270 Wp

Investors

Huawei de 60 Kw

Installed power

110 Mw (126.48 Mwp)

Economic data

Annual performance forecast

203,000,000 kWh

Equivalent to the consumption of

53,500 households

Emission savings

78,000 T of CO2 per year

Financing

Bank credit / Equity capital

PUERTO REAL

Share this project

Other projects

Don Rodrigo

Don Rodrigo

The largest PV plant in Spain and also the first of its kind in Europe to be realised without state subsidies. The Don Rodrigo PV plant, with an output of 175 MWp, went into operation in the third quarter of 2019.

Puerto Real

Puerto Real

Puerto Real 1, with 133 megawatts of installed capacity, is considered one of the largest photovoltaic parks in Spain after its entry into operation in 2021.

Andújar

Andújar

The installation has 396 mobile trackers that are oriented according to the position of the sun and generate a power of 2.2 MW, equivalent to the annual consumption of 2,120 families. The plant also saves 1.8 million tonnes of CO2, an amount equivalent to the savings of 4,500 hectares of forest.

Los Palacios

Los Palacios

This wind farm has a total capacity of 1.82 megawatts (mW), which will generate some 3.7 million kilowatts (kW) per year, equivalent to the annual consumption of some 1,200 homes.

Do you have any questions or queries?

Contact us and we will help you. 

From our headquarters in Andalusia, Ansasol has been dedicated to the planning, development, assembly and marketing of photovoltaic and green hydrogen installations since 2004.

Newsletter

Follow us

Proudly created by ADN Agencia Creativa

Copyright Ansasol © 2022 All rights reserved.